DETAIL
Home » News » FAQ » What are the problems in the current 3t bottom dump truck unloading station?

What are the problems in the current 3t bottom dump truck unloading station?

Views: 0     Author: Site Editor     Publish Time: 2022-09-26      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

1. As the electric locomotive cannot pass the unloading station, the 3t tramcar can only be pulled by the locomotive from the side track with wire rope when unloading. This non-stop operation mode is not only difficult to operate, but also directly threatens the life safety of the hookers.

2. The electric locomotive must bypass the shaft yard to tow a 3t bottom dump mine car, which not only affects the running efficiency of the locomotive, but also brings many unsafe factors to the staff and pedestrians in the shaft yard.

3. Each supporting wheel of the unloading station is first fixed on its own support, and then fixed on the main beam. This structure is unreasonable. On the one hand, it increases the maintenance amount of the unloading station, and more importantly, it increases the center of gravity of the supporting wheel and the instability of the supporting wheel.

4. The main beam for installing bearing wheel support is welded from 20 # channel steel, which is not rigid enough. After more than ten years of operation corrosion, the strength is also greatly reduced, resulting in high vibration of the train.

5. The looseness of the connecting bolts and the vibration of the main beam are easy to cause damage to the supporting wheels and wheel sets.

6. The clearance between supporting wheels on both sides of the unloading station is too large, and the passing safety factor of the electric locomotive is small.

7. The number of unloading curved rail support beams is insufficient. One at the interface, one at the unloading section and one at the reset section, cannot bear the impact force of the 3t tramcar chassis, which is easy to cause damage to the unloading curved rail.


LATEST NEWS
MORE ABOUT OUR NEWS
China Coal Group Sents New Suspended Mining Single Hydraulic Prop to Shanxi And Inner Mongolia
12 June 2024

On June 12, the new suspended mining single hydraulic prop independently developed and produced by China Coal Group was sent to Shanxi, Inner Mongolia and other places, which once again set off a sales frenzy.

3-1.jpg
China Coal Group Ships A Batch Of Mining Flat Trucks To Wenzhou
11 June 2024

On June 11, a batch of high-performance mining flat trucks independently researched and produced by China Coal Group was about to embark on a journey, and its destination was Wenzhou City, Zhejiang Province, a coastal city in eastern China. This is not just an ordinary transportation of commodities, but the interplay of industrialized power and the pulse of the new era of development.

3.jpg
China Coal Group Holds The First Half Of 2024 Business Analysis Meeting
08 June 2024

On June 8, the first half of 2024 business analysis meeting of China Coal Group was grandly held in the meeting room of the Group's headquarters, mainly focusing on the 321 strategic objectives formulated by the Group, comprehensively sorting out and summarizing the first half of the production and operation of the work situation, analyzing the causes of the problem, solving the problems and deficiencies in the current operation and sales work, judging the business situation and discussing the ideas and countermeasures, and arranging and deploying the work in the second half of the year. General Manager of China Coal Group Han Yong, members of the leadership team, general managers of e-commerce companies, plant managers of the Manufacturing Corporation, group companies and the heads of functional departments of more than 70 people attended the meeting.

1.jpg
Shandong China Coal Mining Support Equipment Co., Ltd. was founded in the 1990s with more than 1100 employees. It now has 53 professional companies, 3 Hong Kong companies, 1 British Cayman company and 1 American company. It is a large diversified industrial group integrating intelligent equipment manufacturing, e-commerce, software research and development and intelligent logistics, which is cultivated and supported by the Ministry of industry and information technology, the Ministry of Commerce, the development and Reform Commission, Shandong Province and Jining City.
CONTACT FORM
Form Name
Copyright © 2022 Shandong China Coal Industry & Mining Group Co., Ltd. Sitemap

CONTACT US

Phone:+86-18660761375
Email:sales@chinacoalintl.com
Address:No.11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China